Week 4 — Optimizing value in operations

Same store, same team, same Saturday. This is an X-ray, not a floor plan: two flows laid on top of each other so the one bottleneck becomes visible. Pick a move and watch the two numbers that matter — completed journeys and cost to serve.

Store floor — top-down Baseline
HARDWARE TOOLS GARDEN The Lending Bench TOOL LOANS · MEMBERS Ask Ray ADVICE BAR · 31 YRS Paint Mixing 1 MIXER BINDING CONSTRAINT + 2ND MIXER · RENTED Checkout PAINT PICKUP ▲ ENTRANCE
Customer flow Staff flow Waiting / stuck
Your move Find it · fix it · prove it
Saturday, right now
The four moves — never an A
Completed journeys
600
baseline
Cost to serve
$6.00
baseline
Baseline
On a Saturday, the paint mixing counter is the single thing capping how many customers finish. Ray's advice bar and the Lending Bench have slack — the one mixer doesn't. Find the constraint before you touch anything.
The proof · operating cost ÷ completed journeys
MoveOperating costCompleted journeysCost to servevs. today
Leave it alone$3,600600$6.00—
A · Cut a floor associate$3,120480$6.50 ▲−$1,200 / Sat
B · Pre-batch + roving help$3,600650$5.54 ▼+$700 / Sat
C · Rent a second mixer$4,200760$5.53 ▼+$1,640 / Sat
D · Drop-and-shop the paint$3,600700$5.14 ▼+$1,400 / Sat